Plywood For Construction
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • plywood for concrete formwork
  • Describe
  • Parameter
  • Packaging
  • Daily Output
  • Case
 1, Product Introduction 
ZNSJ high strength plywood for concrete formwork, by using first class compete core veneer of fine pine, eucalyptus and hardwood etc, and each layers was well glued, then twice pressed through cold and hot pressing machine. There’ s no spaces in the middle of the board after sawed. The surface was smooth and well glued with waterproof Phenolic Glue.No warp, no distortion, no cracking, high strength, water resistance and so on, its turnover could be more than 10-15 times.

2, Product Advantages
ZNSJ high strength construction formwork is with characteristics of flat and smooth, no deformation,light weight,easy processing.Compared with traditional steel template,it’s light, wide dimension,more turnover times, and easily demoulded,corrosion resistance, surface smoothness, no remains on the concrete surface,what’s more it advoids the leakage and rough surface on construction when using steel template.
  

Items

Parameters

Product Name

plywood for construction ,construction formwork, wooden formwork,plywood for construction,
 shuttering plywood ,shuttering formwork, wood plywood,plywood for concrete formwork

Specifications

1220*2440*(12-18)mm    1830*915*(12-18)mm

Glue

Phenolic glue

Materials

Pine,Eucalyptus

Moisture Content

9%

Density 

750kg/m³

Modulus Of Elasticity 

≥5000   ≥4000

Modulus Of Rupture

//≥24/mm2  //≥20/mm2

Bonding Strength

0.76

Using times

8-10times



  

   Size(mm)

Thickness(mm)

Gross Weight(kg/piece)

40ft container(pcs)

Packing

1.83*0.915

12

12.06

2250 

75 piece/pallet

 

13

13.06

2077 

69 piece/pallet

 

14

14.07

1929 

64 piece/pallet

 

15

15.07

1800 

60 piece/pallet

 

16

16.07

1688 

56 piece/pallet

 

17

17.07

1588 

53 piece/pallet

 

18

18.07

1500 

50 piece/pallet




   Daily Output of plywood for concrete formwork is about 2000~4000pieces. If you want to order bamboo plywood , please advance 7~10days before loading date.Generally there are 10000~20000pieces of  wood formwork  for construction with different sizes in our warehourse.
Welcome to visit our factory!





Return list